The foundation of every great sports field or commercial green space is expert turf construction. Quality construction goes far beyond simply laying grass - it involves careful planning, soil analysis, drainage solutions, and the use of premium turf varieties suited to your site’s unique needs. Proper site preparation and installation techniques are essential for creating a surface that is safe, resilient, and able to withstand heavy use, weather extremes, and Queensland’s demanding climate.
When turf construction is done right, you benefit from a level, well-drained, and visually appealing surface that supports healthy turf growth and reduces maintenance costs over time. Investing in professional turf construction ensures your field or landscape not only looks impressive but also performs at its best for years to come.
Survey, design levels and falls, then GPS machine-control and laser grading: ±10 mm on the subgrade and ±5 mm on the rootzone at Narangba, and 9,000 m³ of cut and fill over 25,000 m² at North Pine Christian College.
Lateral pipe drainage at 5 m centres (Samford, Mackay) and 10 m centres (Bob Brock, Clive Berghofer), a circular system retrofitted at Metricon Stadium, and gravel banding at Sheldon College.
Imported sand rootzones (250 mm at Samford and Narangba, 100 mm at North Pine and Bob Brock), with gypsum, lime and organic amendments applied to soil-test recommendations.
Designed and installed at North Pine (Hunter Hydrawise controller and a new pump) and connected to a new bore pump at Mackay; coordinated with the irrigation contractor on council fields such as Narangba and Samford.
Paddocks at our Woodford farm set aside and grown in for the job: a six-month managed grow-in for North Pine, certified single-paddock supply for Samford, and a 25,000 m² pad for the 2018 Commonwealth Games.
Washed big rolls for Samford’s 10,000 m² main field, washed turf for Narangba and Mackay, and automatic slab harvesting for high-volume jobs such as Harmony and Grafton Jail.
An average of 3,000 m² a day at North Pine and Harmony, and 220,000 m² supplied, delivered and installed at Grafton Jail over 36 weeks.
Maintenance periods of 8 weeks (Bob Brock) to 13 weeks (Les Hughes, Wendy Allison), a 40-week grow-in contract at Narangba, and as-constructed drawings for Moreton Bay council.
Not every job needs us to build the field. Civil contractors, landscapers and councils also buy turf from us supply-only, harvested at our farm at Woodford QLD 4514.
For a supply-only price, use the project enquiry form below or see our turf varieties.
A field that holds water after rain loses fixtures. Two of our case studies show what fixing it involved:
How slit drainage works and when a field needs it: sand slit drainage for sports fields.
Dakabin, QLD · 7,000 m²
Main soccer field rebuilt for Moreton Bay council: drainage at 10 m centres, 3,000 t of turf sand, Wintergreen couch slabs, 8-week grow-in.
Toowoomba, QLD · 9,000 m²
Stadium field rebuilt on the existing red clay: drainage at 10 m centres, new irrigation, Kikuyu turf, 10-week grow-in.
Ashmore, QLD · 7,700 m² turfed
STRI-specified renovation: deep ripping, 1.4% crown, lateral pipe drainage for a future slit system, Wintergreen couch slabs.
Woodford, QLD · 25,000 m²
Turf grown with HG Turf for the 2018 Commonwealth Games ceremonies and Metricon Stadium main field; 12-month grow-in.
Bray Park, QLD · 25,000 m²
Total rebuild in the 8-week summer holidays: reshaping, drainage, irrigation, turf sand and Wintergreen couch.
Grafton, NSW · 220,000 m²
Wintergreen supplied, delivered and installed over 36 weeks for landscaper Great Gardens, with John Holland as head contractor.
Palmview, QLD · 49,000 m²
Turf supply for new fields and surrounds, plus 20,000 m² of blecavating and around 60,000 m² of laser grading.
Bray Park, QLD · 15,000 m²
Fields reshaped and turfed with certified Wintergreen for Moreton Bay council, then a 13-week maintenance period.
Mackay, QLD · 7,000 m²
Athletics infield designed and built in 2018: herringbone drainage, bore-fed irrigation, 200 mm rootzone, washed Wintergreen.
Carrara, QLD · 20,000 m²
Circular drainage system retrofitted in four weeks before the 2018 Commonwealth Games, trench lines turfed with washed Wintergreen.
Narangba, QLD · 30,000 m²
Full-size and junior soccer fields for Moreton Bay council with washed Wintergreen, 15,000 m² of surrounds, 40-week grow-in.
Dakabin, QLD · 25,000 m² earthworks
Multi-use oval designed and rebuilt 2019–20: drainage to the irrigation dam, new irrigation, USGA sand, Wintergreen.
Samford, QLD · 50,000 m²
Main soccer field in 10,000 m² of washed big rolls plus three smaller fields and surrounds, 12-week maintenance.
Sheldon, QLD · 9,000 m²
Natural turf infield inside a new athletics track: pipe drains, gravel banding, 3,000 t of sand, Wintergreen couch.
Redcliffe, QLD · 15,000 m²
Two baseball fields rebuilt for Moreton Bay council: topsoil import, laser levelling to 1%, Wintergreen slabs, 8-week maintenance.
Strathpine, QLD · 14,000 m²
One senior and four junior fields rebuilt for Moreton Bay council with Wintergreen and a 13-week maintenance period.
See every project with photos on our recent projects page.
Tell us about the project and we will come back to you about scope, turf supply and timing. An outline is enough to start. For a home lawn, use the quote page instead.

Copyright ©2026 Hancey's Turf - Designed by Smart Local